Skip to content

THE PANAMA PERSPECTIVE

Newsletter for Panama Since 2008

  • Home
  • Why Panama
  • Destinations
    • Azuero
    • Boca Chica
    • Bocas del Toro
    • Boquete
    • Panama City
    • Pearl Islands
  • News from Panama
  • Contact

Tag: gatun gas plant

Panama launches natural gas plant: Gatún Generator – will provide 670 MW to the electric system


News from Panama

With an investment of US$1.2 billion and after 36 months of construction, the natural gas plant of Generatora Gatún came into operation on October 1, which will provide 670 MW to the national electricity system representing a crucial advance for the energy diversification of the country. Esteban Barrientos, CEO of the company, highlighted the relevance […]

October 4, 2024

Adrian Prozzo


adrianprozzo@gmail.com / +507 6976-0413

Sign Up For The Newsletter


    Your Name (required)

    Your Email (required)

    Categories

    • News from Panama

    Recent Posts

    • Panama at MarketHub Americas 2025
    • Panama Canal Bitcoin Payments Proposed
    • Panama-Costa Rica Railway to Begin Construction in 2026
    • Panama Plastic Pollution Roadmap to Plastic-Free Future by 2040
    • Panama City Launches 11 Public Space Projects

    Blogroll

    • The Americas Society
    • U.S. Dept of State
    • Wikipedia – Panama
    Proudly powered by WordPress | Theme: lucienne by ThemeFurnace.