{"id":31431,"date":"2021-05-25T11:23:27","date_gmt":"2021-05-25T16:23:27","guid":{"rendered":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/?p=31431"},"modified":"2021-05-25T11:23:27","modified_gmt":"2021-05-25T16:23:27","slug":"environmental-permitting-begins-670mw-panama-thermo","status":"publish","type":"post","link":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/","title":{"rendered":"Environmental permitting begins for 670MW Panama thermo"},"content":{"rendered":"<p><a href=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-31432\" src=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg\" alt=\"\" width=\"654\" height=\"412\" srcset=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg 654w, https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant-300x189.jpg 300w\" sizes=\"auto, (max-width: 654px) 100vw, 654px\" \/><\/a><\/p>\n<p>Panama\u2019s\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/ministerio-de-ambiente-de-panama-miambiente\" target=\"_blank\" rel=\"noopener noreferrer\">environment ministry<\/a>\u00a0has accepted for review an environmental impact study for a 670MW\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/project-profile\/planta-termoelectrica-telfers-planta-termoelectrica-telfers\" target=\"_blank\" rel=\"noopener noreferrer\">natural gas combined cycle power project.<\/a><\/p>\n<p>Generadora Gat\u00fan submitted the document \u2013 prepared by\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/urs-holdings-inc-\" target=\"_blank\" rel=\"noopener noreferrer\">URS Holdings<\/a>\u00a0\u2013 for the US$700mn plant in Col\u00f3n province. The developer holds a provisional license for the project issued by public services regulator\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/autoridad-nacional-de-los-servicios-publicos\" target=\"_blank\" rel=\"noopener noreferrer\">Asep<\/a>.<\/p>\n<p>\u201cDue to the growing demand for energy in the country, the developer has identified the opportunity to invest in the energy sector, through the construction and operation of a combined cycle thermoelectric power plant in the Isla Telfers area that will use a cleaner and more economical fuel, namely natural gas,\u201d highlights the EIS.<\/p>\n<p>The project would also increase firm capacity by incorporating a fuel with low dependence on climatic phenomena, according to the developer, which points to the proposed site\u2019s proximity to existing LNG infrastructure.<\/p>\n<p>Panama was Central America\u2019s first country to incorporate LNG with AES&#8217;s Col\u00f3n complex (pictured).<\/p>\n<p>The EIS shows that\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/international-finance-corp\" target=\"_blank\" rel=\"noopener noreferrer\">IFC<\/a>\u00a0and\u00a0<a href=\"https:\/\/www.bnamericas.com\/en\/company-profile\/the-world-bank-group-grupo-del-banco-mundial-world-bank-banco-mundial\" target=\"_blank\" rel=\"noopener noreferrer\">World Bank<\/a>\u00a0standards, among other norms, would be used in development, and that a survey of residents in the area of influence revealed that 68% expressed a favorable opinion of the project.<\/p>\n<p>Meanwhile, interviews with stakeholders including businesses and community organizations revealed that 35% consider the project as viable due to the distance from populated centers.<br \/>\nGet Vaccinated and stay safe!!<\/p>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f16536-o1\" lang=\"\" dir=\"ltr\" data-wpcf7-id=\"16536\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/blog\/wp-json\/wp\/v2\/posts\/31431#wpcf7-f16536-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"16536\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.6\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f16536-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<p><B><I>Sign Up for our Newsletter:<\/i><\/b>\n<\/p>\n<p>Your Name (required)\n<\/p>\n<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span>\n<\/p>\n<p>Your Email (required)\n<\/p>\n<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span>\n<\/p>\n<p><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Send\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Panama\u2019s\u00a0environment ministry\u00a0has accepted for review an environmental impact study for a 670MW\u00a0natural gas combined cycle power project. Generadora<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[242,12,241,39,248,34,33,62,42,219,11,249,243,7,246,244,262,281],"class_list":["post-31431","post","type-post","status-publish","format-standard","hentry","category-news-articles-panama-perpsective","tag-boca-chica-real-estate","tag-boquete","tag-boquete-real-estate","tag-buenaventura","tag-casco","tag-casco-antiguo","tag-casco-viejo","tag-coffee-in-panama","tag-estate-homes-in-panama","tag-move-to-panama","tag-offshore-real-estate","tag-panama-offshore-real-estate","tag-panama-papers","tag-panama-real-estate","tag-relocate-to-panama","tag-rum-in-panama","tag-safety-in-panama-panama-real-estate-bocas-del-toro","tag-travel-to-panama-rent-in-boquete-expat-tourism"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.7 (Yoast SEO v27.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Environmental permitting begins for 670MW Panama thermo - Blog and Newsletter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Environmental permitting begins for 670MW Panama thermo\" \/>\n<meta property=\"og:description\" content=\"Panama\u2019s\u00a0environment ministry\u00a0has accepted for review an environmental impact study for a 670MW\u00a0natural gas combined cycle power project. Generadora\" \/>\n<meta property=\"og:url\" content=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog and Newsletter\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100088396493750\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-25T16:23:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg\" \/>\n<meta name=\"author\" content=\"Adrian Prozzo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Adrian Prozzo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/\"},\"author\":{\"name\":\"Adrian Prozzo\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/6c118309f214f7da81db90c9905c5e69\"},\"headline\":\"Environmental permitting begins for 670MW Panama thermo\",\"datePublished\":\"2021-05-25T16:23:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/\"},\"wordCount\":238,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/power-plant.jpg\",\"keywords\":[\"Boca Chica Real Estate\",\"Boquete\",\"Boquete Real Estate\",\"buenaventura\",\"casco\",\"casco antiguo\",\"casco viejo\",\"coffee in panama\",\"estate homes in Panama\",\"move to panama\",\"offshore real estate\",\"Panama Offshore real estate\",\"Panama Papers\",\"Panama Real Estate\",\"relocate to panama\",\"Rum in Panama\",\"safety in panama Panama Real Estate Bocas del Toro\",\"travel to panama Rent in Boquete Expat Tourism\"],\"articleSection\":[\"News from Panama\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/\",\"name\":\"Environmental permitting begins for 670MW Panama thermo - Blog and Newsletter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/power-plant.jpg\",\"datePublished\":\"2021-05-25T16:23:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/power-plant.jpg\",\"contentUrl\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/power-plant.jpg\",\"width\":654,\"height\":412},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/environmental-permitting-begins-670mw-panama-thermo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Environmental permitting begins for 670MW Panama thermo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\",\"name\":\"THE PANAMA PERSPECTIVE\",\"description\":\"Welcome and enjoy!\",\"publisher\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\",\"name\":\"THE PANAMA PERSPECTIVE\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Panama-Perspetive-Logo.png\",\"contentUrl\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Panama-Perspetive-Logo.png\",\"width\":199,\"height\":168,\"caption\":\"THE PANAMA PERSPECTIVE\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=100088396493750\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/6c118309f214f7da81db90c9905c5e69\",\"name\":\"Adrian Prozzo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"caption\":\"Adrian Prozzo\"},\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/author\\\/adrian\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Environmental permitting begins for 670MW Panama thermo - Blog and Newsletter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/","og_locale":"en_US","og_type":"article","og_title":"Environmental permitting begins for 670MW Panama thermo","og_description":"Panama\u2019s\u00a0environment ministry\u00a0has accepted for review an environmental impact study for a 670MW\u00a0natural gas combined cycle power project. Generadora","og_url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/","og_site_name":"Blog and Newsletter","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100088396493750","article_published_time":"2021-05-25T16:23:27+00:00","og_image":[{"url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg","type":"","width":"","height":""}],"author":"Adrian Prozzo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Adrian Prozzo","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#article","isPartOf":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/"},"author":{"name":"Adrian Prozzo","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/person\/6c118309f214f7da81db90c9905c5e69"},"headline":"Environmental permitting begins for 670MW Panama thermo","datePublished":"2021-05-25T16:23:27+00:00","mainEntityOfPage":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/"},"wordCount":238,"commentCount":0,"publisher":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#primaryimage"},"thumbnailUrl":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg","keywords":["Boca Chica Real Estate","Boquete","Boquete Real Estate","buenaventura","casco","casco antiguo","casco viejo","coffee in panama","estate homes in Panama","move to panama","offshore real estate","Panama Offshore real estate","Panama Papers","Panama Real Estate","relocate to panama","Rum in Panama","safety in panama Panama Real Estate Bocas del Toro","travel to panama Rent in Boquete Expat Tourism"],"articleSection":["News from Panama"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/","name":"Environmental permitting begins for 670MW Panama thermo - Blog and Newsletter","isPartOf":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#primaryimage"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#primaryimage"},"thumbnailUrl":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg","datePublished":"2021-05-25T16:23:27+00:00","breadcrumb":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#primaryimage","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg","contentUrl":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2021\/05\/power-plant.jpg","width":654,"height":412},{"@type":"BreadcrumbList","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/environmental-permitting-begins-670mw-panama-thermo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Environmental permitting begins for 670MW Panama thermo"}]},{"@type":"WebSite","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#website","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/","name":"THE PANAMA PERSPECTIVE","description":"Welcome and enjoy!","publisher":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization","name":"THE PANAMA PERSPECTIVE","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2023\/09\/Panama-Perspetive-Logo.png","contentUrl":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2023\/09\/Panama-Perspetive-Logo.png","width":199,"height":168,"caption":"THE PANAMA PERSPECTIVE"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100088396493750"]},{"@type":"Person","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/person\/6c118309f214f7da81db90c9905c5e69","name":"Adrian Prozzo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","caption":"Adrian Prozzo"},"url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/author\/adrian\/"}]}},"_links":{"self":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/31431","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/comments?post=31431"}],"version-history":[{"count":1,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/31431\/revisions"}],"predecessor-version":[{"id":31433,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/31431\/revisions\/31433"}],"wp:attachment":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/media?parent=31431"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/categories?post=31431"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/tags?post=31431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}