{"id":19293,"date":"2017-03-14T15:39:57","date_gmt":"2017-03-14T20:39:57","guid":{"rendered":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/?p=19293"},"modified":"2017-03-14T15:39:57","modified_gmt":"2017-03-14T20:39:57","slug":"abs-issues-approval-principle-lng-fueled-bulker-design","status":"publish","type":"post","link":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/","title":{"rendered":"ABS Issues Approval in Principle for LNG-Fueled Bulker Design"},"content":{"rendered":"<p><a href=\"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-19294\" src=\"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg\" alt=\"\" width=\"800\" height=\"380\" srcset=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg 800w, https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship-300x143.jpg 300w, https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship-768x365.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><\/p>\n<p>International classification society ABS has granted Approval in Principle (AIP) for the Seatransporter-DF, a dual-fuel design concept vessel developed by Algoship Designers Ltd. of Nassau, Bahamas.<\/p>\n<p>The design has the capability to accommodate multiple engine types as well as Type-C or membrane containment systems for LNG fuel.<\/p>\n<p>Algoship worked with CleanShips LLC, based in Stamford, CT, to develop a version of the bulk carrier design that would meet specific operational requirements without compromising cargo carrying capacity. The 38,000 DWT version is equipped with a 2,400 m3 LNG fuel containment system that could allow for approximately 100 days\u2019 at sea. Algoship is applying the same design philosophy to Panamax, Ultramax and Kamsarmax sized carriers and has determined that the dual fuel technology is also applicable to other vessel types.<\/p>\n<p>\u201cTechnically innovative designs that advance the use of LNG as fuel will play an increasingly important role in the marine sector, and ABS is working alongside industry to enable this critical technological advancement,\u201d says ABS Executive Vice President for Global Marine Dr. Kirsi Tikka. \u201cAs industry considers future fuel strategies, design concepts that promote the use of LNG as fuel will play an increasingly important role in that mix.\u201d<\/p>\n<p>As the marine industry continues to adjust to comply with more stringent air emission requirements, the use of LNG as a fuel will be adopted in more subsectors in the marine industry. Developed to help meet the current and upcoming international air emission standards, the Seatransporter-DF design can be used in Emission Control Areas (ECAs).<\/p>\n<p>\u201cABS contributed to this effort as a trusted advisor, engaging early in the process to apply its rigorous engineering and safety standards and verify the feasibility of the design,\u201d said Algoship Designers Ltd President Antony Prince. \u201cBy working with ABS through its AIP process, we\u2019ve been able to demonstrate that the Seatransporter was developed with a focus on safety and reliability and will be able to satisfy flag and port state requirements.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>International classification society ABS has granted Approval in Principle (AIP) for the Seatransporter-DF, a dual-fuel design concept vessel<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[242,10,12,241,39,34,33,62,42,16,29,18,22,19,117,219,11,245,6,20,243,7,246,244,44],"class_list":["post-19293","post","type-post","status-publish","format-standard","hentry","category-news-articles-panama-perpsective","tag-boca-chica-real-estate","tag-bocas-del-toro","tag-boquete","tag-boquete-real-estate","tag-buenaventura","tag-casco-antiguo","tag-casco-viejo","tag-coffee-in-panama","tag-estate-homes-in-panama","tag-estate-planning","tag-exchange-property-in-panama","tag-foundations","tag-hydro-electric","tag-investments-in-panama","tag-los-quetzales-lodge","tag-move-to-panama","tag-offshore-real-estate","tag-offshore-real-estate-panama","tag-panama","tag-panama-economics","tag-panama-papers","tag-panama-real-estate","tag-relocate-to-panama","tag-rum-in-panama","tag-travel-to-panama"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.7 (Yoast SEO v27.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABS Issues Approval in Principle for LNG-Fueled Bulker Design - Blog and Newsletter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABS Issues Approval in Principle for LNG-Fueled Bulker Design\" \/>\n<meta property=\"og:description\" content=\"International classification society ABS has granted Approval in Principle (AIP) for the Seatransporter-DF, a dual-fuel design concept vessel\" \/>\n<meta property=\"og:url\" content=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog and Newsletter\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100088396493750\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-14T20:39:57+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg\" \/>\n<meta name=\"author\" content=\"Adrian Prozzo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Adrian Prozzo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/\"},\"author\":{\"name\":\"Adrian Prozzo\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/6c118309f214f7da81db90c9905c5e69\"},\"headline\":\"ABS Issues Approval in Principle for LNG-Fueled Bulker Design\",\"datePublished\":\"2017-03-14T20:39:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/\"},\"wordCount\":331,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/LNG-powered-ship.jpg\",\"keywords\":[\"Boca Chica Real Estate\",\"Bocas del Toro\",\"Boquete\",\"Boquete Real Estate\",\"buenaventura\",\"casco antiguo\",\"casco viejo\",\"coffee in panama\",\"estate homes in Panama\",\"estate planning\",\"exchange property in panama\",\"foundations\",\"hydro electric\",\"investments in panama\",\"los quetzales lodge\",\"move to panama\",\"offshore real estate\",\"Offshore real estate Panama\",\"Panama\",\"panama economics\",\"Panama Papers\",\"Panama Real Estate\",\"relocate to panama\",\"Rum in Panama\",\"travel to panama\"],\"articleSection\":[\"News from Panama\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/\",\"name\":\"ABS Issues Approval in Principle for LNG-Fueled Bulker Design - Blog and Newsletter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/LNG-powered-ship.jpg\",\"datePublished\":\"2017-03-14T20:39:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#primaryimage\",\"url\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/LNG-powered-ship.jpg\",\"contentUrl\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/LNG-powered-ship.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/abs-issues-approval-principle-lng-fueled-bulker-design\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABS Issues Approval in Principle for LNG-Fueled Bulker Design\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\",\"name\":\"THE PANAMA PERSPECTIVE\",\"description\":\"Welcome and enjoy!\",\"publisher\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\",\"name\":\"THE PANAMA PERSPECTIVE\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Panama-Perspetive-Logo.png\",\"contentUrl\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Panama-Perspetive-Logo.png\",\"width\":199,\"height\":168,\"caption\":\"THE PANAMA PERSPECTIVE\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=100088396493750\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/6c118309f214f7da81db90c9905c5e69\",\"name\":\"Adrian Prozzo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"caption\":\"Adrian Prozzo\"},\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/author\\\/adrian\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABS Issues Approval in Principle for LNG-Fueled Bulker Design - Blog and Newsletter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/","og_locale":"en_US","og_type":"article","og_title":"ABS Issues Approval in Principle for LNG-Fueled Bulker Design","og_description":"International classification society ABS has granted Approval in Principle (AIP) for the Seatransporter-DF, a dual-fuel design concept vessel","og_url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/","og_site_name":"Blog and Newsletter","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100088396493750","article_published_time":"2017-03-14T20:39:57+00:00","og_image":[{"url":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg","type":"","width":"","height":""}],"author":"Adrian Prozzo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Adrian Prozzo","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#article","isPartOf":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/"},"author":{"name":"Adrian Prozzo","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/person\/6c118309f214f7da81db90c9905c5e69"},"headline":"ABS Issues Approval in Principle for LNG-Fueled Bulker Design","datePublished":"2017-03-14T20:39:57+00:00","mainEntityOfPage":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/"},"wordCount":331,"commentCount":0,"publisher":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#primaryimage"},"thumbnailUrl":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg","keywords":["Boca Chica Real Estate","Bocas del Toro","Boquete","Boquete Real Estate","buenaventura","casco antiguo","casco viejo","coffee in panama","estate homes in Panama","estate planning","exchange property in panama","foundations","hydro electric","investments in panama","los quetzales lodge","move to panama","offshore real estate","Offshore real estate Panama","Panama","panama economics","Panama Papers","Panama Real Estate","relocate to panama","Rum in Panama","travel to panama"],"articleSection":["News from Panama"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/","name":"ABS Issues Approval in Principle for LNG-Fueled Bulker Design - Blog and Newsletter","isPartOf":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#primaryimage"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#primaryimage"},"thumbnailUrl":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg","datePublished":"2017-03-14T20:39:57+00:00","breadcrumb":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#primaryimage","url":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg","contentUrl":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2017\/03\/LNG-powered-ship.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/abs-issues-approval-principle-lng-fueled-bulker-design\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/"},{"@type":"ListItem","position":2,"name":"ABS Issues Approval in Principle for LNG-Fueled Bulker Design"}]},{"@type":"WebSite","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#website","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/","name":"THE PANAMA PERSPECTIVE","description":"Welcome and enjoy!","publisher":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization","name":"THE PANAMA PERSPECTIVE","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2023\/09\/Panama-Perspetive-Logo.png","contentUrl":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2023\/09\/Panama-Perspetive-Logo.png","width":199,"height":168,"caption":"THE PANAMA PERSPECTIVE"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100088396493750"]},{"@type":"Person","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/person\/6c118309f214f7da81db90c9905c5e69","name":"Adrian Prozzo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","caption":"Adrian Prozzo"},"url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/author\/adrian\/"}]}},"_links":{"self":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/19293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/comments?post=19293"}],"version-history":[{"count":1,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/19293\/revisions"}],"predecessor-version":[{"id":19295,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/19293\/revisions\/19295"}],"wp:attachment":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/media?parent=19293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/categories?post=19293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/tags?post=19293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}