{"id":13660,"date":"2015-06-17T13:32:52","date_gmt":"2015-06-17T18:32:52","guid":{"rendered":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/?p=13660"},"modified":"2015-06-17T13:32:52","modified_gmt":"2015-06-17T18:32:52","slug":"boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system","status":"publish","type":"post","link":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/","title":{"rendered":"Boquete is getting a $22.5 Million upgrade in it&#8217;s water and sewer system"},"content":{"rendered":"<p><a href=\"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-13661\" src=\"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg\" alt=\"varella in boquete\" width=\"657\" height=\"438\" srcset=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete.jpg 1024w, https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-300x200.jpg 300w\" sizes=\"auto, (max-width: 657px) 100vw, 657px\" \/><\/a><\/p>\n<p>Susie and I were sitting happily sipping a cocktail on the side walk at Black and White when this motorcade comes flying by.\u00a0 I said that it has to be President Varella and wondered what he was here for.\u00a0 I have seen the surveyors working in the streets and I know the head engineer signed a 3 year lease here, so I knew it was really going to happen.\u00a0 Finally, we are getting the upgrade to our water and sewer system that will insure the growth potential for Boquete.<\/p>\n<p>President Juan Carlos Varela Rodr\u00edguez handed over the order to proceed to the company Asociaci\u00f3n Accidental Aguas de Boquete for the \u201cStudy, Design, Construction, Maintenance and Operation of the Aqueduct, Water Treatment System, Sanitary Sewage Network and Residual Waters Treatment Plant for the District of Boquete, in the Province of Chiriqui\u201d.<\/p>\n<p>This project, which has a value of 22.5 million Balboas and includes de complete design of the works for supply and distribution of potable water for the townships of Bajo Boquete, Alto Boquete and the community of Los Naranjos for a useful life of 20 years, will improve the quality of life of 20 thousand residents in the townships of Los Naranjos, Bajo Boquete and Alto Boquete.<\/p>\n<p>In addition, the project includes gathering, treatment and storage of the intake at Los Ladrillos and Valle Escondido and the complete design of the sanitary sewage system for the community of Bajo Boquete, including the design of the residual waters treatment system.<\/p>\n<p>The project, which will be in charge of Asociaci\u00f3n Accidental Aguas de Boquete, comprised by the companies: Constructora Urbana, S.A. and Administradora de Proyectos de Construcci\u00f3n, S.A. (APROCOSA, for its initials in Spanish), must finish in a period of 5 years starting with the Order to Proceed, issued by the National Council for Sustained Development (CONADES, for its initials in Spanish).<\/p>\n<p>President Varela Rodr\u00edguez emphasized that with this project, not only will the quality of life of the residents of District of Boquete be improved, but also the local economy will be impacted with the creation of new job opportunities and economic prosperity for the residents of this town in Chiriqui will be attained.<\/p>\n<p>The President reiterated the Program 100% Potable Water and Basic Health is a strategic plan for all Panamanians, for the country and for the Government; since without access to these conditions there may be no development with equity and justice, with social inclusion and participation in the enjoyment of the richness the country is capable of generating.<\/p>\n<p><strong>Previous Process<\/strong><\/p>\n<p>The Public Act for the bid on this project was set on January 7th, 2015 and the receipt and opening of proposals were executed on March 20th, 2015.<\/p>\n<p>Nine companies participated in the bid and the project was given to the bidder with the highest score in the weighing methodology, as long as they comply with the minimum obligatory requisites.<\/p>\n<p><strong><a href=\"https:\/\/www.presidencia.gob.pa\/Galeria-596-The-President-hands-over-order-for-22.5-million-Balboas-for-the-construction-of-the-sewage-system-for-the-District-of-Boquete\" target=\"_blank\">Click here for the slide show<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Susie and I were sitting happily sipping a cocktail on the side walk at Black and White when<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-13660","post","type-post","status-publish","format-standard","hentry","category-news-articles-panama-perpsective"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.7 (Yoast SEO v27.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Boquete is getting a $22.5 Million upgrade in it&#039;s water and sewer system - Blog and Newsletter<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Boquete is getting a $22.5 Million upgrade in it&#039;s water and sewer system\" \/>\n<meta property=\"og:description\" content=\"Susie and I were sitting happily sipping a cocktail on the side walk at Black and White when\" \/>\n<meta property=\"og:url\" content=\"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog and Newsletter\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100088396493750\" \/>\n<meta property=\"article:published_time\" content=\"2015-06-17T18:32:52+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg\" \/>\n<meta name=\"author\" content=\"Adrian Prozzo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Adrian Prozzo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/\"},\"author\":{\"name\":\"Adrian Prozzo\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/6c118309f214f7da81db90c9905c5e69\"},\"headline\":\"Boquete is getting a $22.5 Million upgrade in it&#8217;s water and sewer system\",\"datePublished\":\"2015-06-17T18:32:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/\"},\"wordCount\":500,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/varella-in-boquete-1024x683.jpg\",\"articleSection\":[\"News from Panama\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/\",\"name\":\"Boquete is getting a $22.5 Million upgrade in it's water and sewer system - Blog and Newsletter\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/varella-in-boquete-1024x683.jpg\",\"datePublished\":\"2015-06-17T18:32:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#primaryimage\",\"url\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/varella-in-boquete-1024x683.jpg\",\"contentUrl\":\"http:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/varella-in-boquete-1024x683.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Boquete is getting a $22.5 Million upgrade in it&#8217;s water and sewer system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\",\"name\":\"THE PANAMA PERSPECTIVE\",\"description\":\"Welcome and enjoy!\",\"publisher\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#organization\",\"name\":\"THE PANAMA PERSPECTIVE\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Panama-Perspetive-Logo.png\",\"contentUrl\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Panama-Perspetive-Logo.png\",\"width\":199,\"height\":168,\"caption\":\"THE PANAMA PERSPECTIVE\"},\"image\":{\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=100088396493750\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/#\\\/schema\\\/person\\\/6c118309f214f7da81db90c9905c5e69\",\"name\":\"Adrian Prozzo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g\",\"caption\":\"Adrian Prozzo\"},\"url\":\"https:\\\/\\\/panamaadvisoryinternationalgroup.com\\\/blog\\\/author\\\/adrian\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Boquete is getting a $22.5 Million upgrade in it's water and sewer system - Blog and Newsletter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/","og_locale":"en_US","og_type":"article","og_title":"Boquete is getting a $22.5 Million upgrade in it's water and sewer system","og_description":"Susie and I were sitting happily sipping a cocktail on the side walk at Black and White when","og_url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/","og_site_name":"Blog and Newsletter","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100088396493750","article_published_time":"2015-06-17T18:32:52+00:00","og_image":[{"url":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg","type":"","width":"","height":""}],"author":"Adrian Prozzo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Adrian Prozzo","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#article","isPartOf":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/"},"author":{"name":"Adrian Prozzo","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/person\/6c118309f214f7da81db90c9905c5e69"},"headline":"Boquete is getting a $22.5 Million upgrade in it&#8217;s water and sewer system","datePublished":"2015-06-17T18:32:52+00:00","mainEntityOfPage":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/"},"wordCount":500,"commentCount":0,"publisher":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#primaryimage"},"thumbnailUrl":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg","articleSection":["News from Panama"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/","name":"Boquete is getting a $22.5 Million upgrade in it's water and sewer system - Blog and Newsletter","isPartOf":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#primaryimage"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#primaryimage"},"thumbnailUrl":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg","datePublished":"2015-06-17T18:32:52+00:00","breadcrumb":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#primaryimage","url":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg","contentUrl":"http:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2015\/06\/varella-in-boquete-1024x683.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/boquete-is-getting-a-22-5-million-upgrade-in-its-water-and-sewer-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Boquete is getting a $22.5 Million upgrade in it&#8217;s water and sewer system"}]},{"@type":"WebSite","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#website","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/","name":"THE PANAMA PERSPECTIVE","description":"Welcome and enjoy!","publisher":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#organization","name":"THE PANAMA PERSPECTIVE","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2023\/09\/Panama-Perspetive-Logo.png","contentUrl":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-content\/uploads\/2023\/09\/Panama-Perspetive-Logo.png","width":199,"height":168,"caption":"THE PANAMA PERSPECTIVE"},"image":{"@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100088396493750"]},{"@type":"Person","@id":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/#\/schema\/person\/6c118309f214f7da81db90c9905c5e69","name":"Adrian Prozzo","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ad1feae25ee47fd05cad15b4eecb3f298066f00b30501ec8ab74742778287eba?s=96&d=identicon&r=g","caption":"Adrian Prozzo"},"url":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/author\/adrian\/"}]}},"_links":{"self":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/13660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/comments?post=13660"}],"version-history":[{"count":1,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/13660\/revisions"}],"predecessor-version":[{"id":13662,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/posts\/13660\/revisions\/13662"}],"wp:attachment":[{"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/media?parent=13660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/categories?post=13660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/panamaadvisoryinternationalgroup.com\/blog\/wp-json\/wp\/v2\/tags?post=13660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}